Procedures For Inspection

Types of Inspections

Category 1
⚡

New Installation

This applies to where the whole installation has been installed as new, if a complete rewire has been carried out.

Category 2
🛠️

Alteration

This applies where one or more existing circuits have been modified or extended (for example to add a socket), or items such as a consumer unit (fusebox) and switching equipment have been replaced.

Category 3
➕

Extension

This applies to Temporary installations, where, in the event that work has not been completed an application can be done for extension.

Category 4
🔌

Reconnection

This applies to Installations that have been disconnected by Vinlec, in that circumstance the installation is reinspected.

Category 5
📋

Condition

This applies if an existing installation has been modified by adding one or more new circuits.

Ready to proceed?

If you are planning a new installation or modification, ensure you have the correct licensing before work begins.

📝 Apply for License